Monday, November 23, 2015


2005 Foremost CTR Single Coil Tubing Hybrid Drilling Rig 

Coiled Tubing Hybrid Drilling Rig 

Hybrid Single Coiled Tubing Rig 

 Mast
Foremost 85' mast, 140,000 lb maximum hook load w/ (4) lines,
1" drill line, (2) 4 stage mast raising cylinders, chains, stand pipe,
hydraulic piping, utility winch, access ladder, lighting, fall arrest

Substructure 
Foremost trailer mounted raised substructure; sliding trolley
ВОР handler w/ (2) hydraulic cylinders, manual cellar controls,
standpipe valve, steam manifold, explosion proof lighting, mounted
on 2005 peerless Т/А 16 wheel trailer, tires 11 r22.5, steel buds,
spring suspension, w/ rear outriggers, front leveling jacks,
hydraulic & electrical lines

No comments: